For Builders · San Antonio · New Braunfels · Hill Country

Low Voltage & AV Pre-Wire for Custom Home Builders in San Antonio TX

KZ Audio & Video has been running low voltage in San Antonio custom homes since 1999. We work at rough-in, from your plans, alongside your framer and electrician. Every builder we work with gets a written AV pre-wire spec at no cost, and it is theirs to keep.

Since 1999
In the Audio Business
Free Consult
No Pressure, No Pitch
Clean Install
We Leave It Like We Found It
5.0 Stars
29 Google Reviews

Scope at Rough-In

What We Handle Before the Walls Close

One trade, one rough-in visit, one point of contact. Everything below gets pulled after framing and mechanical, before insulation, and every run is labeled at both ends and photographed for your project file.

Structured Cabling & Network

Data and coax home runs to a central head-end, wired access point locations placed against the floor plan, and a network backbone sized for the house rather than the router the buyer already owns.

Display Locations

Recessed media boxes, power coordinated with your electrician, conduit down to outlet height for future pulls, and blocking called out for your framer before the wall closes.

Whole-Home & Outdoor Audio

Ceiling and in-wall speaker runs by zone, checked against the lighting plan so speakers and cans are not fighting for the same ceiling. Patio, pool, and landscape runs stubbed and capped.

Dedicated Theater Rough-In

Speaker positions set from the seating layout, riser conduit, projector power and signal path, screen wall backing, and isolation decisions made before insulation.

Cameras, Doorbell & Access

Camera runs at eave height, doorbell and transformer path, contacts at exterior openings, and keypad locations. Platform-agnostic, so the buyer picks the system later.

Shade Pockets & Conduit

Framed pockets with power on tall and west-facing glass, plus conduit sleeves under every hardscape crossing. Both are nearly free before the pour and expensive to impossible after.

No Cost, No Obligation

A Written Pre-Wire Spec for Your Plans

Most builders do not have a written low-voltage standard. Each house gets whatever the sub on site that week decided to run, which is why two homes off the same plan can come out completely different behind the drywall.

We will write yours. Rack and head-end requirements, conduit runs and sizes, ceiling speaker layout by room type, network drop schedule, display locations with blocking and power, camera and access rough-in, and shade pockets. Built against your plan set, with your name on it.

It is yours to keep and to issue to any low-voltage contractor you choose. We ask for a shot at the rough-in on your next build, and nothing more than that.

Labeled ceiling speaker pre-wire run in a Stone Oak custom home during framing
Speaker rough-in on a Stone Oak new-construction theater, pulled and labeled at framing. See the finished room →

Quick Answer

Who Does AV Pre-Wire for Custom Home Builders in San Antonio?

KZ Audio & Video handles low voltage and AV pre-wire for custom home builders across San Antonio, New Braunfels, Boerne, and the Texas Hill Country. Work happens at rough-in, after framing and mechanical, before insulation and drywall. A standard scope covers structured cabling and network backbone, ceiling and in-wall speaker runs, display locations with blocking and conduit, camera and doorbell rough-in, shade pockets, and the head-end rack location. Every builder gets a written AV pre-wire specification at no cost, built against their own plan set, which they keep and can issue to any low-voltage contractor they choose. The company has run low voltage in San Antonio homes since 1999 and installs the theaters, whole-home audio, networks, and camera systems those rough-ins feed, so the wire in the wall matches what actually gets installed at trim. Call (210) 981-4098 to schedule a plan review.

Why It Matters

One Standard, Every House the Same

A written spec turns low voltage from a per-house improvisation into a line item your supers can hand to anyone. Three things change the moment you have one.

Late Requests Become Easy Yeses

A buyer asking about a theater or patio audio at trim is a change order when the infrastructure is not there, and a simple add when it is.

Conflicts Get Solved on Paper

Ceiling speakers versus can lights, blocking behind a display, rack location in conditioned space. All free to fix at plan review, all expensive at rough-in.

The Walls Are Documented

Every run labeled at both ends and every wall photographed before insulation, with a copy to you. That is what settles a question two years later about what is behind the drywall.

AV Pre-Wire for Builders: Frequently Asked Questions

Low voltage rough-in happens after framing and mechanical rough-in, before insulation and drywall. That is the only window where this work is cheap. Once the walls close, every run costs multiples of what it costs at framing and some of it stops being possible without opening drywall. We ask for five business days notice at rough-in ready, and we would rather see the plans at permit stage so locations are marked before anyone is standing in the house.

Yes, and it produces a better result than walking the framed house cold. Give us the plan set and we mark up the head-end location, the display locations that need blocking, ceiling speaker positions checked against the lighting plan, camera locations, and conduit runs. Marking a plan takes an hour and settles the conflicts on paper. Finding them at rough-in means a framer, an electrician, and us all standing in the same room solving it live.

That is the normal case, and it is the reason a written standard matters. We rough in the infrastructure that keeps options open: conduit behind every display location, blocking where a TV is likely, a head-end that can hold equipment, and a network backbone. If the buyer asks for a theater or whole-home audio at trim, the house is ready and it is an easy yes. If they never ask, you spent very little and the home shows better for having the option.

No. Most builders worth working with already have someone. The written pre-wire spec is yours to keep and your current contractor can build to it, which makes your homes more consistent regardless of who does the work. If your contractor ever cannot hit a rough-in date, call us. We would rather be the backup in your phone than not be in it.

It depends on the size of the home and how much gets roughed in. Structured cabling and a network backbone price very differently from a house with a dedicated theater, whole-home audio zones, camera coverage, and motorized shade pockets. Send a plan set and we price it against the actual house instead of a square-foot guess. The written spec is free either way and carries no obligation to use us for the work.

San Antonio and the surrounding Hill Country: New Braunfels, Boerne, Bulverde, Canyon Lake, Spring Branch, Helotes, Stone Oak, Fair Oaks Ranch, Timberwood Park, Schertz, and Cibolo. We also run jobs in the Austin area regularly, so if you build up that way, ask. If you build somewhere else entirely, still ask. We would rather tell you honestly that a job site is too far than take it and be late to your rough-in.

Send Us a Plan Set

We will mark it up and write your pre-wire spec at no cost. Yours to keep, and yours to issue to whoever does the work.

Serving San Antonio  ·  Boerne  ·  Canyon Lake  ·  New Braunfels  ·  Hill Country

Call or Text: (210) 981-4098